G4E

TAP pipe deliveries complete to Albania, Greece and Italy

On 10 October 2017, the last shipment of steel line-pipes for the construction of the Trans Adriatic Pipeline (TAP) arrived in Thessaloniki, Greece, marking the completion and final delivery... more


Interview with René Bautz, CEO of Gaznat and currently chairing Green Gas Initiative (GGI)

“GGI has set itself an ambitious objective: transporting gas that is carbon-neutral by 2050.” more


Report: Direct catalytic methanation of liquid biomass wastes

Biomass waste products can be converted into a medium methane content gas (Bio-SNG). In this feasibility study, Aspen plus process modelling has been used to design processes for the... more


Nyhamna strengthens Norway’s position as gas exporter

Gassco has taken over on 1 October as operator for the gas processing plant at Nyhamna in Aukra local authority on Norway’s west coast. more


Over PLN 73 Mio in EU funds for GAZ-SYSTEM for the next gas pipeline

Over PLN 73 Mio from European Union funds were procured by GAZ-SYSTEM for the construction of the Czeszów-Kiełczów pipeline. The new pipeline is an element of the expansion of the gas... more


ERA-Net Smart Grids Plus offers new funding opportunities for transnational Smart Energy projects

The initiative has launched a new call and a follow-up initiative is being formed offering funding opportunities starting from next year. more


Grexel to power Lithuanian Guarantee of Origin registry

Following an international public tendering, the Lithuanian electricity transmission system operator, Litgrid, has selected Grexel as the provider of the central registry for electricity... more


Video: Smart grid simulation in matlab

Simulation of smart grid with -PV array Fuel Stack- Dc booster generation connected with utility grid. A three phase inverter is used to change Dc- to ac to connect in main grid. (source... more


ERIG conference & workgroup summit 2017 in Brussels

This year the conference has the motto “Connecting electrons and molecules – the role of the energy infrastructure” and will discuss how well this approach is reflected in the EU research... more


Trans Adriatic Pipeline is 50 % completed

The Trans Adriatic Pipeline (TAP) is now more than 50 % completed, nearly 16 months after construction began. This includes all engineering, procurement and construction scope. more

Load more